ARIA SPINTA

Requirments

TECHNICAL REQUIREMENTS
> THE STAGE & SET

Optimal stage dimensions 14 x 14 m.
Black dance floor.
A corridor down the centre of the auditorium (dividing the seating in two) is required.
Eight (bigger stages ten) side curtains and three curtains upstage (see the plan) will be attached to our alluminium bars and then to your fixed bars.

For the left upstage curtain we need a black wooden bar in the length of the curtain (see the plan).

The bar upstage center will be used for the snow (PVC pieces) machine, which we will bring with us, which is light and is operated by the dancers from left backstage.

We need a solid hanging point between the 1st and 2nd curtain left stage for a swing with one dancer on it. The point should be strong enough to hold 100 kg.

For each downstage right and upstage right we need either a solid hook on the wall, close to the curtain, or two 80 kg stage weights.

Ladder 2 m high

Aria Spinta starts with 4 dancers at the entrance door of the theatre making the ticket service (control of the tickets and programme leaflet distribution). Dancers and technicians are moving through the whole theatre during the performance, so we particularly need the stage and audience areas to be connected and easily accessible to them.
All curtains of the theatre and 5 projectors (projectors we will bring with us) fall down towards the end of the performance. All the decor is served by dancers.

The setting up of the stage takes about 10 hours (excluding light and sound), building down takes about two hours and we need two machinists for assistance.

Stage plan

 For print download PDF document (75 kB):

TECHNICAL REQUIREMENTS
> THE SOUND

We bring a little box with a minidiscman, an amplifier, a battery and loudspeakers in. Two wireless handmicrophones (like SM58 or better) are placed on the front of the little box with loudspeakers and we send in the usual sound installation.

We need:
- 2 radiomicrophones handheld system (wireless handmicrophones) with clamps
- 1 normal stand for microphones with a stereo coupler
- 1 normal CD player at the sound control
- 1 mixer sound control with inputs for the CD player and wireless microphones with good equaliser, 6 independant outputs with also equaliser if that's possible
- 6 high quality loudspeakers (2 on the back, 2 on the face, 2 on the side of audience)
- amplifier, cables, accessories for a normal installation

TECHNICAL REQUIREMENTS
> THE LIGHTS
Light plan:

 For print download PDF document (230 kB):

List of light equipement required:
4x Fresnel 5 Kw
34x PC 1 Kw
21x PAR 64 CP 60
16x PAR 64 CP 62
3x Profil 2 Kw
8x Profil 1 Kw
1x HMI Follow spot
2x Flood light 500 w
6x stativ 1.5 m
9x floor stand
9x light bulb 100 w [brought by company]
5x light bulb 25 w [brought by company]
Dimmers:

67x dimmer chanels 2 Kw
4x dimmer chanels 5 Kw

programable light board

FINANCIAL REQUIREMENTS

Touring company consists of eight members:
5 dancers
2 technicians
1 tour manager

Accommodation: 9 people in twin and single rooms

Travel costs: van with set and 5 persons from Prague
1 flight from Spain
1 flight from France
1 flight from Prague
5 flights from Italy
1 van or cargo with set of 300 kg

Per-diem: 30,- EUR /day/person

Performance fee