IN BELLA COPIA

Requirments

TECHNICAL REQUIREMENTS
> THE STAGE & SET

optimal stage dimensions 14 m x 14 m
black dance floor
no curtains
empty grid
One full day before the performance is needed for set up.
Light and sound desks have to be placed in the auditorium.

> stage and light plan are available here

The company travels with 11 iron stands and all iron connections necessary for setting up independent structure for lights and sound.
All the projectors (provided by the theatre) used in the performance as well asl all the loudspeakers (provided by the theatre) are fixed on those stands. Lights and sound move during the performance therefore the lights are connected with dimmers by multicables. The sound cables are led along the light cables.

TECHNICAL REQUIREMENTS
> THE SOUND

Mixing console

located in the auditorium, dimmered light, headphones.
Inputs:
1 x CD + 1 x MD players (or 2 x CD) with Single play mode
1 x handheld wireless mic
Inserts:
1 x compressor (for mic)
Outputs:
please see Stage plan for names of the stands
1. The Gate
2. The Silence
3. + 4. The Wardrobe
5. + 6. front stage (incl.EQ + DDL)
7. + 8. backstage (incl.EQ)

Boxes

The Silence
2 linked boxes with clamps, will be hanged on horizontal pipe (4 cm diameter).
Dimensions 300 x 200 x 200 mm (H x W x D, can be different max +/- 15 %)

The Gate
same as The Silence

The Wardrobe
2 boxes located in between the legs of the stands
(height is 1200mm, base diagonal 1150mm, max.weight of one box 40 kg)

click detailed plan below:

Back + Front
power must be adequated to the size of auditorium.Subwoofers are required.


Notes:
There are 20m cables needed for The Silence,The Gate and The Wardrobe boxes, since these stands are moving during the performance.

For microphone we need clip - will be hanged on the rope from one stand.

All visible sound equipment on the stage must be black coloured.

Sound consultancy:
Michal Vanis, michal.vanis@volny cz

TECHNICAL REQUIREMENTS
> THE LIGHTS


Stage and light plan:
Stage and light plan For print download PDF document (240 kB):

48 channels x 2 000W
total 70kW
11x PAR 64 CP62 23x PAR 64 CP61
11x PAR 64 CP60 8x PC 1000W
4x PC 650W 2x Fresnel 2000W
12x Quartz 500X 1x profile 1kW 50°
5x profile 1kW 25°/50°

Stand name
PAR 64
PC 1kW
PC 650W
Fresnel 2kW
Cattor
Quartz
500w
Profile
Liner
channels
Gate 3xCP62
3xCP61
1x 1000W
2x 650W
6 8
Silence 5xCP61 2x 650W 2 5
Wardrobe 9xCP60 5x 1000W 4 10
Follow spot 1x 1000W 1 2
Hang over 2xCP60 1x 1000W 1 3
Mike
Sun 8xCP62 1x50 5
Wind 9xCP61 6
Sad lights 8xCP61 4
House front 2x25/50 2

Loudspeaker cables must be lead along the light cables.

Additionals and specials:

Gate: barndoors for PC, 1x multi 8 chanels 20 m + sound cable 20 m
Silence: 1x multi 5 chanels, 20 m + sound cable
Wardrobe: 5x barndoors for PC, 1x multi 8 chanels + 2 single cables 20 m, sound cable 20m
Follow spot: 2 single cables, 10 m
Hang over: 3 single cables, 20 m
Sun: 1x multi 5 chanels, 25 m
Wind: 6 stands (1m 80) + 2 base ground
Sad lights: 6 stands (1m 80)

Light consultancy:
Vincent Longuemare, massimosilenzio@libero.it

FINANCIAL REQUIREMENTS

Touring company consists of nine members:
6 dancers
2 technicians
1 tour manager

Accommodation: 9 people in twin and single rooms

Transportation/cargo: 500 kg (max length 140 cm)

Travel costs: 6 flights from Italy, 1 flight from Czech Rep., 1 flight from Bulgaria, 1 flight from France

Per-diem: 30,- EUR a day for 9 members of the company

Performance fee