Duration 1 hour without interval
> THE STAGE
- stage dimensions: 11m width, 13 m length
- black dance floor
- 10 pipes to position according to light plan (see below) of which one has to be fixed in order to avoid swaying during performance
- 1 black back drop of min 12 m length and 7 meters in height to be used on our kabuki system
> THE SET
- 1 backdrop of plastic publicity banners
- 1 structure of approximately 100kg tube hanged
- 3 iron structures for plastic publicities to be hanged
- 1 pipe for kabuki drop
- on wheel structure made up of TVs and computers
- 4 tables for light and sound board
> Technical requirments
> THE LIGHT
The light board is on stage
List of light equipment required:
- - 13 Profiles 1Kw 36-50°
- - 14 Fresnel 1KW with filter holders and barn doors
- - 4 Pc 2KW with filter holders and barn doors
- - 6 Par 64 CP 60 with 3 filter holders
- - 6 PAR 64 CP 61
- - 18 Par 64 CP 62 with 4 filter holders
- - 6 pin spots
- - 8 coda 1Kw
- - 6 floor stands
- - 68 dimmer channels
- - sufficient cables for the functioning of the light plan
- - dmx on stage
- - light board with memories, time in/out functions, cross faders and sub masters
- - the set has 7 male French plugs that may need adapters to function
Filters:
- 8 Lee 013 per Fresnel 1KW
- 4 Lee 013 per domino 1KW
- 4 Lee 174 per PAR
- 1 Lee 174 per Fresnel 1KW
- 4 L196 per PC 2KW
- 3 L021 per PC 1KW
- 2 L147 per PAR
All the cabling and fixing material is being supplied by the venue
> LIGHT/STAGE PLAN:

> THE SOUND
- 1 Mixing console located on the stage with minimum 8 inputs, Solo and Mute buttons
- 100 mm faders
- 2 auxes switched pre/post
- inserts
- 4 bus outputs
- headphones
- dimmered or digital lamp (as small dimensions as possible)
Inputs
- 1 dynamic cardioid microphone (SM 58 or similar) with clamp and black
- cable (min. length of the cable is equal to diagonal of the stage)
- compressor in insert
- 1 microphone (+ 1 for replacement)
- 1 hall/reverb unit with possibility of creating own presets (predelay,
reverb time etc.)
- 1 delay effect unit with possibility of creation my own presets
- 3 CD or MD players with antishock (no DVD players)
- 1 condenser microphone hanged above the stage for miking children
Outputs
- bus 1,2 to main sound system incl. subwoofers, 2 x 30 band EQ, power DDL if possible
- bus 3,4 to monitors on the stage usable for additional sound effects
> THE VIDEO
- 1 DVD player with SCART output
> TECHNICIANS AND OTHER PERSONAL REQUIRED
Build up and Build down:
- 2 stage hands
- 3 light technicians of which one familiar with the light board
- 1 sound technician
General rehearsal: 1 stage hand, 1 light technician, 1 sound technician
Unloading and loading of van: 2 people
Costumes: 1 costumier to take care of the costumes : washing, drying and ironing before each performance.
Financial requirments
Touring company consists of 7 members:
- 4 interpreters
- 2 technicians
- 1 choreographer / tour manager
Arrival day of the company is always two days before first performance. We do need one day before the performance for setting up the decor, lights, sound and for technical run through.
Accomodation
Travel cost
- Freight: travel by one van from Italy
- 4 flight from Rome / Italy (Sometimes 1 flight from Paris/ France will replace one flight from Rome / Italy (tour manager)
- 1 flight from Ancona / Italy
- 1 flight from Brussels / Belgium
- Travel costs can be discussed depending on company‘s tour before and after required.
Per diems
- 7 x 30,-EUR per day: 3 days for 1 performance, 4 days for 2 performances, etc.
Performance fee